- Debris Removal - Clean up of the 911 sq ft crawlspace; remove all debris, trash, abandoned material and the existing insulation - haul-off and disposal included
- 10-Mil Vapor Barrier - New 10 mil vapor barrier over the 911 sq ft crawlspace floor; measured and cut on-site, staked and secured
- Dehumidifier with Condensation Pump - AprilAire E100 dehumidifier with companion condensate pump (1)
- Electrical Outlet - Electrical breaker with GFCI outlet and light for the dehumidifier - includes the electrical permit and inspection (1)
- Crawlspace Door - Crawlspace door made of PVC board, installed in the existing opening (1)
SCOPE OF WORK - PARTIAL ENCAPSULATION
Clean Up & Debris Removal: Clean up of the 911 sq ft crawlspace - remove all debris, trash, abandoned material and the existing insulation; haul-off and disposal included.
10 Mil Vapor Barrier: Install a new 10 mil vapor barrier over the 911 sq ft crawlspace floor, measured and cut on-site, staked and secured.
Crawlspace Door: Install a new crawlspace door made of PVC board in the existing opening.
Electrical Outlet: Electrical breaker with GFCI outlet and light for the dehumidifier - includes the electrical permit and inspection.
Dehumidifier: Supply and install an AprilAire E100 dehumidifier with companion condensate pump.
10% Customer Discount: 10% discount applied to the project total.
NOT INCLUDED:
- Structural repairs
- Mold or fungus chemical treatment
- Plumbing
- Hardwood floor, tile or subfloor replacement
- Work not described above
Notes:
**Existing mold growth goes dormant once the crawlspace is dried out; no chemical treatment is included.
**The crawlspace will be accessible for storage after completion; the liner can be doubled in a designated storage area on request.
**Jobsite will be left clean once completed.
**Contractor is not responsible for damage caused inside the home while repairing the foundation.
Warranty:
**12 months workmanship.
**5 years on the dehumidifier.
Payment Terms:
Total Project Cost: $6,176.35
10% Customer Discount: -$617.64
Total Project Cost: $5,558.71
Deposit to Schedule: $2,779.36
Final Payment: $2,779.35
Check is a preferred method.
**You can pay by credit card using the link below.
request.plastiq.com/pay-tidewater-home-improvement-llc
Cards not eligible for payment: Virtual Affirm credit card
Validity: valid until September 17, 2026.